Parsons Green SW6 2018

Project completed: January 2019
Time to complete: 2 weeks
Description: We completed this classic-feel bathroom renovation within a top-floor 3 bedroom flat in Parsons Green, Fulham.

The project involved:

1. Complete first and second fix plumbing and electrical works
2. Installation of Shower enclosure with fixed panel glass, thermostatic mixer, overhead shower
and hand-held hose
3. Installation of recessed bathroom downlights and LED mirror
4. 600mm wall-hung vanity unit, with countertop basin
5. Contemporary WC unit
6. LED mirror
7. Porcelain tiling on walls and floor
8. Underfloor heating