Bespoke House Builders in London
14
Sep

London Bridge SE1 2019

Project completed: November 2019
Time to complete: 3 weeks
Description: Installation of classic-feel double bathroom renovation within a 3 bedroom flat in London Bridge, Southwark.

The project involved:
1. Complete first and second fix plumbing and electrical works
2. Installation of Shower enclosure with fixed panel glass, thermostatic mixer, overhead shower
and hand-held hose
3. Installation of recessed bathroom downlights and LED mirror
4. Traditional pedestal and basin and contemporary WC unit
5. LED mirrors
6. A combination of 1200mm by 800mm copper finish Porcelain tiling; and classic metro-feel brick tiling on walls
7. Sanding and treating original floorboards