Fulham SW6

Project completed: February 2020
Time to complete: 3 weeks
Description: The project brief was to design and install the main bathroom within this ground-floor 3- bedroom property in Fulham.

The project involved:
1. Redesigning and reconfiguring the lighting within bathroom to incorporate adequate downlighters, mood and niche lighting
2. We installed an underfloor heating system, with wireless programmable thermostat to control
the floor and radiator temperature within the room
3. Bespoke carpentry to maximise storage facility spanning across the room; LED mirrored cabinet above
4. Wetroom area with wall-mounted rainforest shower head, 2-way diverter mixer and hand-held
shower wand. Minimalist sliding shower enclosure enclosure
5. A wonderful combination od matt black metro and patterned tiling throughout the bathroom
6. Plastered and decorated throughout in a Farrow & Ball colour scheme.