
Baker Street W1 2018
Project completed: Nov 2018
Time to complete: 3 weeks
Description: We worked with the client’s designers to renovate the master and en-suite bathrooms within this 3-bedroom flat in Central London.
The project involved:
Conducted on-site surveys and offsite consultation with the client’s designers to ensure proposed layouts were suitable
Main Bathroom: shower enclosure installed on a raised tray to comply with existing central soil stack running through the property; wall hung vanity unit with underside drawers; LED mirror; wall hung WC and concealed cistern; alcove shelving finished with mosaic tiling; underfloor heating
En-suite bathroom: shower enclosure with overhead rainforest-shower head and hand-held wand and a 2 way diverter mixer; wall hung vanity unit with underside drawers; bespoke-cut 8mm bevelled mirror; wall hung WC and concealed cistern; alcove shelving finished with mosaic tiling; underfloor heating
0 comments