14
Sep
SandsEnd SW6 2019
Project completed: August 2019
Time to complete: 2 weeks
Description: We completed this classic-feel bathroom renovation within a 5-bedroom property in Sands End, Fulham.
The project involved:
1. Complete first and second fix plumbing and electrical works
2. Installation of Shower enclosure with fixed panel glass, thermostatic mixer, overhead shower
and hand-held hose
3. Installation of recessed bathroom downlights and LED mirror
4. 900mm wall-hung vanity unit, with countertop basin
5. Traditional pedestal and basin and contemporary WC unit
6. LED mirror
7. Porcelain tiling on walls and floor
8. Underfloor heating
0 comments