14
Sep

Niton Street SW6 2020

Project completed: July 2020

Time to complete: 3 weeks

Description:  A fun projected completed in the midst of Covid-related lockdowns, product delays and material shortages!  We worked with the client to design, build this second bathroom within a lovely townhouse in Fulham.  The brief was for the bathroom to be suitable for daily use, be a centre point of relaxation and combine the benefits of smart home technology. The result was fantastic finish and another very satisfied client!

 

The project involved:

  1. A complete gut-out of existing fixtures and fittings, back to brick
  2. Completion of joist works to repair damage to incumbent joists and completion of all subfloor and external plumbing work
  3. Installation of smart-compliant lighting and heating within the bathroom, controllable and programmable from the client’s mobile device
  4. A minimalist shower enclosure on swivelling-slide door to minimise loss of walkway space, completed with rainforest overhead, hand-held wand and 2-way diverter mixer
  5. A Stone (all 400kgs of it!) free standing bath 1500mm by 850mm with floor mounted bath filler overlooking the window
  6. LED mirror with demister and adjustable tone lighting
  7. Sleek wall mounted vanity unit with slimline basin and basin mixer
  8. 600 by 600 porcelain tiles on floor and wall surface areas.
  9. Reskimmed, with non-tiled zones decorated in Farrow& Ball teal tone